LPG
Kochi–Coimbatore–Erode–Salem LPG Pipeline
1.53 MMTPA authorised capacity, 31 Mar 2026458 kmLPG
Operator read
Kochi–Coimbatore–Erode–Salem LPG Pipeline is a 458 km lpg pipeline operated by Kochi Salem Pipeline Pvt Ltd (BPCL-led consortium), running from Kochi, Kerala to Salem, Tamil Nadu, with 1.53 MMTPA authorised capacity as at 31 Mar 2026.
Endpoints
Origin
Kochi, Kerala
9.9312°N, 76.2673°E
Destination
Salem, Tamil Nadu
11.6643°N, 78.146°E
Configuration diagram
Schematic diagram pending. Source candidates: PNGRB authorisation order, KSPPL investor disclosures.
Source and scope
Authorised capacity as at 31 Mar 2026. PNGRB reports the authorised KSPPL LPG system as 458 km and 1.53 MMTPA, with 203 km operational as at March 2026. The unchanged slug preserves route URLs.